|
IMZ-Ural Motorcyles, Parts, and Service in Southeast Michigan
|
|
|
Crankshaft Assembly
While we were at the factory, 3-piece 750 crankshafts were not being assembled. However, 5-piece 650 crankshafts were being assembled. Both crankshafts are assembled in the same manner.
Click on the pictures to go to a larger version
Loading outside web with needle bearing and connecting rod.
Intermediate plate being installed between the outer webs.
Loading other web into upper ram of the press.
Aligning the crankshaft webs.
All pieces of the crank assembly ready to be pressed together.
Crankshaft being pressed together.
Finished crankshaft assemblies ready for inspection.
This webpage last modified: Jan 11 2010 at 11:45:03 PM
This webpage created: Aug 13 2005 at 1:44:15 PM
Copyright © 2010 CRAWFORD SALES COMPANY
Slab-Red
template pak
based on a design by
Bryan Bell
|
|
|
|