CRAWFORD SALES COMPANY
 

Home

About Us

Ural Models

Royal Enfield Home (updated 03-10-08)

Ural Inventory

Dealer Prep

Parts

Service

Accessories & Trim

Performance & Upgrades

Tools & Maintenance

IMZ Accessories / 750 Engine

Web Links

News and Events (updated 04-19-08)

Used Bikes (updated 02-11-08)

Crawford's Trip to Russia 2005

Articles - Helpful Hints for Owners, by Owners

 

IMZ- Ural Motorcyles, Parts, and Service in Southeast Michigan  

Crankshaft Assembly

While we were at the factory, 3-piece 750 crankshafts were not being assembled. However, 5-piece 650 crankshafts were being assembled. Both crankshafts are assembled in the same manner.


Click on the pictures to go to a larger version



Loading outside webs_240:

Loading outside web with needle bearing and connecting rod.

Intermediate Plate_240:

Intermediate plate being installed between the outer webs.

Loading center web_240:

Loading other web into upper ram of the press.

Aligning the webs_240:

Aligning the crankshaft webs.

Crankshafts awaiting pressing_240:

All pieces of the crank assembly ready to be pressed together.

Pressing crankshafts together_240:

Crankshaft being pressed together.

Assembled crankshafts_240:

Finished crankshaft assemblies ready for inspection.


This Page was last updated: Monday, April 21, 2008 at 1:06:34 AM
This page was originally posted: 8/13/05; 1:44:15 PM.
Copyright 2008 CRAWFORD SALES COMPANY